Safety Teamwork Prosperity Integrity Environment

Waihi

------ International WaihiClient: Waihi Gold Mining Company
Value:$70 million

Start date: September 2003

The project
The Waihi gold mine is located within the township of Waihi, 150 kilometres south east of Auckland.  The current contract was awarded in 2006, however Macmahon has been operating on site since 1998, with the contract extended a number of times.

The contract requires open pit mining, transfer of ore and waste across a main roadway to the mill, and the development of the tailings dam to an environmentally safe state.

Scope of work:

  • Drill and blast
  • Mining of ore and waste
  • Operate and maintain crushing and conveying systems
  • Placement of waste on tailings dam

 Challenges and innovations

  • Operating close to a town means that the team are met with challenges associated with dust and vibration issues.
  • Macmahon works closely with the client to overcome these issues and stringent restrictions on drill and blast, mining, crushing and construction activities are in place, to ensure social impacts are minimised.